Thank you all for your patience while we attempt to get Beat H back up and running after the 2022/23 winter floods. The landowner has agreed to undertake significant works to remove dangerous failing bank revetments and cut back some of the impassible fallen trees. The plan is to retain as much naturally fallen timber in-channel as possible to provide cover and promote natural channel morphology - hopefully resulting in improved spawning, nursery and holding habitat (as well as more interesting fishing). We hope to have Beat H up and running again in time for the back end of the season when our lower beats generally provide the best fishing.
top of page
bottom of page
Great shot from a member of the Iron Bridge over the weekend